University of West Georgia – Nursing Building
University Multipurpose Facility.
The University of West Georgia selected Spencer Bristol Engineering, a Gray company, for the completion of its Nursing Building.
In Numbers
- Carrollton, GALocation
- 60,000 s.f.Square Footage
Completed in 2013, this 60,000 s.f., two-story facility includes training rooms, lecture halls, classrooms, and conference rooms. The mechanical system consisted of two 110-ton chillers installed in parallel with primary and secondary chilled water loops. Three large air handling units with medium and low-pressure ductwork provided supply air to terminal units located throughout the building. The heating system consisted of a high efficiency gas- fired boiler and circulating hot water pumps.
Gallery
Explore Services
-
Construction
Pre-construction
Facility
Equipment
Self-perform
Strategic sourcing & procurement
-
Professional Services
Engineering
Design
Automation solutions
-
Specialty Equipment
Custom equipment design-build Modular process skids OEM contract manufacturing Processing equipment Stainless-steel & specialty alloy fabrication Distributed products -
Real Estate
Incentive coordination
Land acquisition
Construction financing
Build-to-suit/sale leaseback