Toyota Motor Manufacturing

Automotive Manufacturing Facility.

Gray was one of six American general contractors selected to build Toyota’s first U.S. assembly plant located in Georgetown, KY. The original facility was 3.8 million s.f. with a total investment in excess of $800 million.

  • Location
    Georgetown, KY
  • Square Footage
    545,700 s.f.
  • Operational
    Phase I: 15 months, Phase II: 14 months
Toyota Motor Manufacturing
Georgetown, KY
545,700 s.f.
Phase I: 15 months, Phase II: 14 months

Gray completed multiple projects for Toyota in the 80s and 90s, which helped establish Gray in the automotive manufacturing space. Ultimately, this led to Gray currently being recognized as a leading automotive engineering, design, and construction partner.

Project Gallery

Explore Services

  • Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Architecture

    BIM/VDC

    Sustainable Design

  • Pre-Construction

    Facility

    Equipment

  • Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Fabrication

    Skid Systems

    Maintenance

  • Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated service provider deeply rooted in engineering, design, and construction services for the world’s leading companies.