Siemens Gas Turbine Manufacturing Facility
Living Large & Making Company History.
Siemens Energy, Inc. and Gray have a history that dates back more than 20 years. The companies partnered on a milestone project to build a gas turbine manufacturing facility, which at the time was Siemens’ largest project, and the largest project in Charlotte for three decades.
- LocationCharlotte, NC
- Square Footage489,905 s.f.
- Operational13 months
Complex Efficiency at its Best
This 489,905 s.f. plant and office complex was built on the campus of Siemens’ existing Steam Turbine and Generator Service Center. With this facility, Siemens expanded its existing steam turbine and generator manufacturing site, now producing the world’s most efficient gas turbine.
The facility was designed based on lean manufacturing practices, which means it was built nearly 100,000 s.f. smaller than would have been needed a generation ago. It was also built according to the U.S. LEED green building standards.
This facility had the honor of being highlighted in President Obama’s 2012 State of the Union address as an example of how Siemens helped to lead the charge to bring more manufacturing jobs back to the U.S.
Gallery
Explore Services
Process & Packaging Systems Engineering
Civil/Building Engineering
Mechanical/Electrical Engineering
Architecture
BIM/VDC
Sustainable Design
Pre-Construction
Facility
Equipment
Automation & Controls
Production-First IT
MES/MIS
IoT/Data
Custom equipment Ovens & cookers Process skids Batching equipment Clean-in-place systems Bioreactors Extruders Distributed products Mixers & blenders Feasibility Studies
Pre-Construction
Incentive Coordination
Land Acquisition
Construction Financing
Build-to-Suit/Sale Leaseback
Master Planning
Front-end Services
Strategy Consulting
Related Projects
About Gray
Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.