Skip to main content

Valeo Engine Cooling

Engine Cooling System Manufacturing Facility.

In Numbers

  • Greensburg, IN
    Location
  • 346000 s.f.
    Square Footage
  • Phase I: 9 months, Phase II: 12 months, Phase III: 7 months
    Operational
Valeo Engine Cooling
Greensburg, IN
346000 s.f.
Phase I: 9 months, Phase II: 12 months, Phase III: 7 months

Based in Paris, France, Valeo is an independent industrial group that produces components, integrated systems, and modules for the automotive industry. Gray was selected to provide design-build services for the original engine cooling system manufacturing facility and two subsequent expansions.

Gallery

Explore Services

  • Engineering

    Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Design

    Pre-Design

    Architecture

    Design Technology

    Specialized Services

    Post-Design

  • Construction

    Pre-Construction

    Facility

    Equipment

    Self-perform

  • Digital

    Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Equipment
    Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders Control panel fabrication
  • Development

    Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Planning

    Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.