Gray was selected as the design-build contractor for the Toyoda Gosei (TG) project, a 226,000 s.f. plant that included process utilities.

  • Location
    San Antonio, TX
  • Square Footage
    226,000 s.f.
  • Operational
    12 months
Toyoda Gosei
San Antonio, TX
226,000 s.f.
12 months

As a first-time concept for Toyota, most Toyota Motor Manufacturing suppliers were located on the same campus. All suppliers on campus were given their own building, but each of those operations had to comply with campus-wide standards for features and internal building systems.

 

Gray was able to meet all construction schedules, which allowed for early installation of process equipment.

 

Projects highlights included heavy conventional steel structure, four overhead cranes, and jib cranes.

Gallery

Explore Services

  • Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Architecture

    BIM/VDC

    Sustainable Design

  • Pre-Construction

    Facility

    Equipment

  • Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders
  • Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.