Skip to main content

Sejong Alabama LLC

Exhaust Welding Facility.

In Numbers

  • Fort Deposit, AL
    Location
  • 147184 s.f.
    Square Footage
  • Phase I: 6 months, Phase II: 5 months
    Operational
Sejong Alabama LLC
Fort Deposit, AL
147184 s.f.
Phase I: 6 months, Phase II: 5 months

Korea’s Sejong chose Gray to provide design-build services for its new 97,184 s.f. exhaust welding facility to supply the Hyundai assembly plant in Alabama. Five years after the original construction, the company asked Gray to complete a 50,000 s.f. expansion to this facility.

Gallery

Explore Services

  • Engineering

    Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Design

    Pre-Design

    Architecture

    Design Technology

    Specialized Services

    Post-Design

  • Construction

    Pre-Construction

    Facility

    Equipment

    Self-perform

  • Digital

    Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Equipment
    Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders Control panel fabrication
  • Development

    Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Planning

    Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.