Nissan North America, Inc.
Automotive Supplier Gateway.
Gray was selected to design and build a 300,000 s.f. Nissan Supplier Logistics Center, which acts as a gateway for vehicle parts from the outside plant.
In Numbers
- Canton, MSLocation
- 300000 s.f.Square Footage
- 9 monthsOperational
This facility was designed with maximum flexibility to meet the different needs of various suppliers that would lease space in the building.
Gallery
Explore Services
-
Construction
Pre-construction
Facility
Equipment
Self-perform
Strategic sourcing & procurement
-
Professional Services
Engineering
Design
Automation solutions
-
Specialty Equipment
Custom equipment design-build Processing equipment OEM contract manufacturing Control panel fabrication & integration Stainless-steel & specialty alloy fabrication Distributed products Modular process skids -
Real Estate
Incentive coordination
Land acquisition
Construction financing
Build-to-suit/sale leaseback