Skip to main content

Mitsubishi Power Systems Americas

LEEDing with Innovation.

Mitsubishi has developed, manufactured, and marketed wind turbines for more than three decades and is one of the leading wind turbine manufacturers in the world. Gray was selected to provide design-build services for Mitsubishi’s new wind turbine nacelle plant.

  • Location
    Fort Smith, AR
  • Square Footage
    230,000 s.f.
  • Operational
    12 months
Mitsubishi Power Systems Americas
Fort Smith, AR
230,000 s.f.
12 months

The facility was awarded LEED Gold certification and touts 40% reduction in domestic water usage and 30% reduction in overall energy consumption.

Gallery

Explore Services

  • Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Architecture

    BIM/VDC

    Sustainable Design

  • Pre-Construction

    Facility

    Equipment

  • Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders
  • Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.