Automotive Interior Manufacturing Buildout.

Johnson Controls, a manufacturer of automotive interiors, selected Gray to provide design-build services for the original building and two subsequent additions on its Alabama campus.

In Numbers

  • Cottondale, AL
    Location
  • 381000 s.f.
    Square Footage
  • Phase I: 6 months, Phase II: 8 months, Phase III: 11 months
    Operational
Johnson Controls, Inc.
Cottondale, AL
381000 s.f.
Phase I: 6 months, Phase II: 8 months, Phase III: 11 months

This project was tackled in phases, with the original phase and building being completed in just five months. This project provided especially challenging conditions to Gray due to soft soil and heavily wooded areas.

Gallery

Explore Services

  • Engineering

    Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Design

    Pre-Design

    Architecture

    Design Technology

    Specialized Services

    Post-Design

  • Construction

    Pre-Construction

    Facility

    Equipment

    Self-perform

  • Digital

    Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Equipment
    Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders Control panel fabrication
  • Development

    Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Planning

    Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.