Allvac Forging

Manufacturing Facility Construction.

Gray has partnered with Allvac Forging on multiple projects at the company’s manufacturing facility in Richburg, S.C. dating back to 2006.

  • Location
    Richburg, SC
  • Square Footage
    191,934 s.f.
Allvac Forging
Richburg, SC
191,934 s.f.

The first was a design-build project for a 58,434 s.f. metal forging facility. Additional projects included the upgrade of Allvac’s specialty steel rolling mill with an addition of 48,500 s.f. and renovation of 85,000 s.f.

 

During all these projects, Gray team members provided no disruption to existing operations.

Project Gallery

Explore Services

  • Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Architecture

    BIM/VDC

    Sustainable Design

  • Pre-Construction

    Facility

    Equipment

  • Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Fabrication

    Skid Systems

    Maintenance

  • Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated service provider deeply rooted in engineering, design, and construction services for the world’s leading companies.