Back Menu

WHIRLPOOL CORPORATION

Cleveland, Tenn.
Add to Favorites Remove from Favorites

Whirlpool Corporation, the world’s leading manufacturer of major home appliances, chose Gray to build a 1,550,283 s.f. manufacturing facility, including testing labs and a distribution center. This was Whirlpool's first project in the U.S. since 1905, replacing a 100-year-old facility just seven miles away.

Project Facts

  • 121-acre site
  • Project completed in three phases
  • Project is the largest single investment Whirlpool has made in the U.S.
  • Facility received LEED® Gold certification for Phase One & Two

Elements of sustainable design incorporated into the facility include:

Site Impact

  • Low-impact design for storm water management
  • Reduced heat-island effect with reflective roofing
  • Reduced irrigation by use of native plants
  • Minimization of construction waste
  • Use of recycled building materials
  • Wetlands mitigation of three streams

Operational Impact

  • Reduced water usage with low-flow plumbing fixtures
  • Improved indoor air quality by use of low-VOC building materials
  • Commissioning strategies for efficient building systems
  • Irrigation water supplied only by rainwater

Employee Impact

  • Bicycle racks
  • Changing and shower facilities
  • Preferential parking for fuel-efficient vehicles

Services Provided by Gray:

  • Architecture
  • Building Systems Analysis and Design
  • Building Information Modeling (BIM)
  • Project Visualization
  • Civil Engineering
  • Structural Engineering
  • Construction Management
  • LEED® Administration
  • LEED® Certification
  • LEED® Management
  • LEED® Design
  • LEED® Commissioning
  • Sustainable Design
  • Building Commissioning

Contact Us