Courtyard by Marriott - Mission Valley

First-Class Hospitality Project.

This 159,556 s.f. project was built for Tarsadia Hotels, one of the top privately owned hotel companies in the U.S. Tarsadia is renowned in the hospitality industry for developing and operating numerous first-class, hospitality-related assets.

  • Location
    San Diego, CA
  • Square Footage
    159,556 s.f.
  • Operational
    7 months
Courtyard by Marriott - Mission Valley
San Diego, CA
159,556 s.f.
7 months

This project included complete renovation of a 322-room hotel with most of the building being stripped. All mechanical systems were either replaced or refurbished including the installation of an energy-efficient HVAC and window systems.

Gallery

Explore Services

  • Process & Packaging Systems Engineering

    Civil/Building Engineering

    Mechanical/Electrical Engineering

  • Architecture

    BIM/VDC

    Sustainable Design

  • Pre-Construction

    Facility

    Equipment

  • Automation & Controls

    Production-First IT

    MES/MIS

    IoT/Data

  • Custom equipment Ovens & cookers
    Process skids Batching equipment
    Clean-in-place systems Bioreactors
    Extruders Distributed products
    Mixers & blenders
  • Feasibility Studies

    Pre-Construction

    Incentive Coordination

    Land Acquisition

    Construction Financing

    Build-to-Suit/Sale Leaseback

  • Master Planning

    Front-end Services

    Strategy Consulting

About Gray

Gray is a fully integrated global service provider specializing in engineering, design, construction, digital, equipment manufacturing, and real estate services.