This project, completed by Spencer Bristol, A Gray Company, included the upgrades and expansion of an existing chilled water central plant. Project services included the preparation of concept drawings and specifications in sufficient detail to be used as a scope document for a design/build contractor. 

Project Facts

  • Existing (3) 1,050 ton chillers were removed and replaced with (3) new 1,500 ton machines, as well as new chilled water primary and secondary pumps, new piping headers and new electrical feeders.
  • A building addition was provided due to the planned phasing of the work, to allow new chillers, pumps and headers be installed. 

Services Provided by Gray:

  • Electrical Engineering
  • Mechanical Engineering
  • Plumbing Engineering
  • Fire Protection Engineering